basic civil engineering surveying unit 4 and 5 notes
Module –I (10 Hrs)
1. Concept of Surveying- Definition of surveying, Classification, Principle,
Accuracy
2. Linear Measurement- Different methods of direct measurement instrument for
chaining, Ranging, Chaining on uneven slopping ground, Errors
...See more
in Chaining,
Corrections.
3. Chain Surveying – Chain triangulation, Survey stn., lines, locating ground
features, field work, instruments for setting out basic problems in chaining,
obstacles in chaining
Module –II (10 Hrs)
4. Compass Surveying – Principles use of Prismatic Compass, Measurement of
bearings, Conversion of bearings, Local attraction, Correction of compass
traverse.
5. Plane Table Survey- Principles, Advantages and disadvantages, Equipment,
Accessories and their uses. Methods of plane table survey. Two point and three
point problems.
Module –III (10 Hrs)
6. Levelling- Types of levelling and their uses, Permanent adjustment, Curvature
and refraction effects.
7. Contouring-Characteristics and uses of contours. Methods of contouring.
Module –IV (10 Hrs)
8. Theodolite Survey – Application in Height and distance measurements.
Permanent adjustment of transit theodolite, methods of repetitions and
reiterations.
9. Curve Setting – Simple circular curve setting by chain, tape & theodolite
10. Minor Survey Instruments – Box-sextant, Planimeter, Pantagraph, their working
principles and uses.
Views: 3504
Added: 3 years ago
Answer the Question